Version 6 Upgrade Notice
Scheduled Maintenance Report for TelcoSwitch Group
Completed
The scheduled maintenance has been completed.
Posted Jun 17, 2021 - 21:39 BST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 17, 2021 - 21:00 BST
Scheduled
Version 6 Upgrade Notice

We have scheduled in works to upgrade the following server(s) to CallSwitch V6:

MT501,
MT510

This service will be upgraded in the evening of the 17/06/2021. During this upgrade window there will be around 15 minutes of downtime.

Following the upgrade, the end-users will need to upgrade their CallSwitch Communicator on both Mobile and Desktop editions to the V6 client.

The V5 communicator will display a message prompting the user to download and install the new version to assist with this process, however mobile app users will need to go to their respective app stores and download the V6 app from there (credentials will remain unchanged)

The V6 release notes for both the MT & CC variants can be found on our knowledge base here:

https://support.telcoswitch.com/hc/en-us/articles/360001702957

If required, the download links for the desktop communicator can also be found here:

https://download.callswitch.net
Posted Jun 03, 2021 - 12:07 BST
This scheduled maintenance affected: CallSwitch (Hosted Telephony Platform).